Site C
Bree Drive SW, Bremerton, WA 98312 (south site)
Functional Screening summary
- Functional Scoring Rank: tied for #6
- Accessibility: moderate improvements needed
- Adjacencies: minimal impact
- Developability: straightforward development
- Infiltrative soils: can infiltrate storm system following Industrial Stormwater General Permit requirements
- Fuel consumption from base: 5% to 10% charging loss
- Site configuration: easily accommodates program
- Environmental justice impacts: 10-20% census tract affected
- Utility availability: storm and sewer utility service lines greater than 0.25 mile; fiber, gas, cable television and telephone between 500 feet and 0.25 mile; electric less than 500 feet to service line
- 2nd Tier Critical Area Setbacks/Mitigation: no Critical Area mitigation
- 2nd Tier Displacement: no displacements
Comparative Analysis findings
TIME FACTORS
- Acquisition – Single parcel with willing owner.
- Land Use – Acceptable land use.
- Permitting – Possible wetlands along east edge of full parcel. Standard permitting for sub-parcel only.
- Construction – Forest practices permit.
FUNCTIONALITY
- Access – Need to navigate through Gorst traffic conditions. Travel in mins: 10.
- Maintenance/Replacement – Standard maintenance.
- Flexibility – up to 30 acres for expansion.
- Septic/Sewer – Septic
DEVELOPABILITY
- Site Prep – Forest practice
- Grading/Drainage/Utilities – Moderate grading; infiltrative soils, septic, access to other utilities.
- Access – Via Bree Drive to State Route 3
- Risk – Airport uses and shared access with Amazon
- Community – Concerns about transit congestion in Gorst; distance from other Kitsap Transit facilities.
COST
- Administrative Cost = 8%
- Assessed Value = $605,000
- Design/Permitting Costs = 15%
- Development Costs = TBD
ENVIRONMENTAL
- Possible wetlands in southeast corner. May require critical area site assessment.