Site D
6225 Sunnyslope Road SW, Port Orchard, WA 98367
Functional Screening summary
- Functional Scoring Rank: #2
- Accessibility: moderate improvements needed
- Adjacencies: minimal impact
- Developability: straightforward development
- Infiltrative Soils: must discharge to surface water
- Fuel consumption from base: 5% to 10% charging loss
- Site configuration: easily accommodates program
- Environmental justice impacts: 10-20% census tract affected
- Utility availability: storm utility service line greater than 0.25 mile; remaining utilities less than 500 feet to service line
- 2nd Tier Critical Area Setbacks/Mitigation: no Critical Area mitigation
- 2nd Tier Displacement: x1 household
Comparative Analysis findings
TIME FACTORS
- Acquisition – Multiple parcels with multiple ownership.
- Land Use – Will require rezoning.
- Permitting – Standard site development permits. No environmental encumbrances.
- Construction – Power transmission lines along back of property.
FUNCTIONALITY
- Access – Requires travel along rural residential roads and State Route 3 to reach Charleston Base (7.8 miles). Time in minutes: 15-20.
- Maintenance/Replacement – Retaining walls for slope exceeding 5%.
- Flexibility – 10+ acres. Room for expansion with acquisition of undeveloped parcel(s) east of site.
- Septic/Sewer – Septic
DEVELOPABILITY
- Site Prep – Some demolition and light timber harvesting.
- Grading/Drainage/Utilities – Easy Grading. Soils insufficiently infiltrative; must treat and discharge to surface waters. Access to utilities.
- Access – Straight/flat access and continuous right-of-way entry on Sunnyside Rd SW. High frontage improvement potential.
- Risk – Wetland to southeast susceptible to runoff impacts.
- Community – Rural neighborhood across the street.
COST
- Administrative Cost = 10% plus relocation of 1 household.
- Assessed Value = $797,000
- Design/Permitting Costs = 12%
- Development Costs = TBD
ENVIRONMENTAL
- Wetlands in southeast and southwest corners. Requires critical area site assessment.